our school

Today was the last day of the first year of Brightworks. It is a blur, so more pictures and details will come, as soon as I wrap my head around these days, weeks, months; these people: kids, parents, fellow staff; these arcs; what we’ve done.

IMG_1299

Because the best thing about it is that we did it. The hurtles, the triumphs, the things that crumbled and fell and the ones that sang out and brought smiles and joy in the learning and doing.

We did it. This is Brightworks.

deconstruction

Today, tired and a little droopy after Exposition, the kids had a chance to take a breather and reflect.

IMG_1474

IMG_1469

IMG_1472

IMG_1442

IMG_1444

Clean.

IMG_1450

IMG_1452

IMG_1463

IMG_1466

Deconstruct.

IMG_1459

IMG_1255

IMG_1257

IMG_1258

IMG_1259

IMG_1263

IMG_1268

IMG_1270

IMG_1273

 

last exposition, first year

Wow Exposition!

Debbie’s last Wednesday hot lunch of the year:

D7K_2290

D7K_2287

Last minute rehearsals:

IMG_1439

D7K_2285

And reminders:

D7K_2302

And test rides:

IMG_1176

IMG_1190

And then the night began.

IMG_1213

IMG_1214

With cake,

IMG_1229

And prosciutto,

IMG_1235

And aerial silk curtains powered by moms.

D7K_2373

Spies,

D7K_2383

D7K_2386

D7K_2400

D7K_2405

D7K_2421

D7K_2425

D7K_2433

Music,

D7K_2449

D7K_2450

Birds,

D7K_2459

D7K_2462

D7K_2470

D7K_2478

D7K_2481

Currency group,

D7K_2482

And rickshaw rides.

IMG_1223

D7K_2487

D7K_2495

D7K_2515

D7K_2535

D7K_2568

All that happened. Yes.

the night of

Pictures and a fuller story will come tomorrow, but for now:

Peeping of chickadees,
Spies and poison plots,
The unveiling of a gigantic rickshaw,
Fresh prosciutto,
The biggest double-layer cake I’ve ever seen,
Happy parents and family and friends,
Ovations and happy birthday to Brightworks, and us.

Can’t stop smiling.

high adventure

I’m not sure where to start in writing today’s post. Is it with the audacious idea that a group of ten- to thirteen-year-olds would agree to do a 64 miles of bike riding in two days, or with the fact that it was their teacher who came up with the idea? Or is it the deluge of rain that greeted them yesterday morning as they were heading out and the bike tune-ups that happened beforehand? Perhaps with the campout, the fist-sized marshmallows, the mile-long uphill ride in Marin, or crossing the Golden Gate in both rain and sun. Or maybe it’s with the parents who let their kids take on this moment of high adventure with barely any hesitation.

But pictures say more than I can. (Josh, I don’t know how you took pictures while riding.) Besides, I haven’t even got the full story from these exhausted but jubilant Goats and the intrepid Josh. I’m sure grand tales of high adventure will come.

The faces of yesterday’s departure:

D7K_1863

D7K_1858

D7K_1859

D7K_1876

On the road, by the bay.

D7K_1880

D7K_1888

Bridge crossing.

D7K_1904

D7K_1930

The north bay.

D7K_1935

D7K_1949

D7K_1959

D7K_1964

Still smiling.

D7K_1971

D7K_1995

D7K_2000

The road was tough. At the camp-out at Samuel P. Taylor, the Goats were exhausted but thrilled to have made it.

D7K_2017

D7K_2021

D7K_2035

D7K_2045

This morning, as the Goats got ready to head back to the city. They broke camp at 11am.

D7K_2055

D7K_2062

Back on the much sunnier road.

D7K_2064

D7K_2073

D7K_2086

D7K_2140

Up hills.

D7K_2173

The Golden Gate.

D7K_2206

D7K_2209

D7K_2230

D7K_2247

We waited out front to give a cheer as the Goats rolled into school around 6pm.

IMG_1893

They made it back – dirtier, more tired, ready to eat – but so filled with pride in the journey.

IMG_1159

IMG_1906

Hooray Goats!

As the last week of the first year continues to bring such high notes, I admit that I’m still just as excited to be a part of Brightworks as I was on the very first day of school. Maybe that was obvious.

and they’re off

The Undead Goats have been training for the last two months on their bikes and are now making a 30-mile biking trek to Samuel P. Taylor park in Marin to camp out for the night and test their skills on the road. They headed out this morning in a surprise spring downpour, but were smiling all the way!

IMG_1113

Melissa will be driving the van packed with gear up to Samuel P. Taylor.

IMG_1115

Headed out the front door.

IMG_1116

IMG_1127

Reminders from Josh.

IMG_1130

IMG_1133

A last minute pep-talk from Nora, with encouragement to stay together on the roads and work together to get to their destination.

IMG_1138

IMG_1139

The line-up, and a final farewell.

IMG_1150

They’re off!

IMG_1154

We can report at this time that they made it, but more details from the road will come tomorrow when they get back!

Meanwhile at the school, prep continued for Wednesday’s big show!

IMG_1882

IMG_1883

It’s surreal and strange to think that today was our last Monday of the first year at Brightworks School…

IMG_1885

ceremonious

It’s exciting and impossible and terrifying to believe that we only have one more week of school left! The pace has been picking up in a great way, with performances getting ready for show time and rickshaws on their way to being tested, and a little bit of pause for ceremony and reflection.

This morning, Mackenzie showed us a video about Caine’s Arcade in LA and we talked about the persistence of this kid to make his dreams into reality using scraps and imagination.

IMG_1385

This led us to Kid City, where we talked about how much this very first Brightworks project meant to us, and how important it is that we see that the deconstruction of Kid City, taking place next week, will really be the resurrection of all the pieces that made up this first draft of an amazing kid-designed space.

IMG_1392

IMG_1393

IMG_1395

IMG_1396

We imagined together what kinds of projects the pieces of Kid City will become and where we might see the painted plywood and colored 2x4s next.

IMG_1403

Then Clementine, the youngest of the Brightworks kids and the student who will see the most projects made out of Kid City because she will be one of our students at the school for the longest, ceremonially removed the first screw from Kid City.

IMG_1407

Hip hip hooray!

IMG_1408

Then the second Market Day, hosted by the currency group, happened in Kid City after Mark led some discussion on ways to improve the Market Day experience.

IMG_1410

D7K_1733

D7K_1735

D7K_1738

D7K_1739

D7K_1746

The rest of the day: bikes and trying to fix the MIG welder and play rehearsals and lunch!

D7K_1768

D7K_1775

IMG_0993

D7K_1777

IMG_0985

Henry made hot lunch for us in lieu of Kristie this Friday. Props!

D7K_1788

D7K_1791